Challenge
A regional supercenter chain embarked on a massive store remodeling and opening initiative.
Working with multiple vendors created a number of challenges, including time inefficiencies and incorrect materials and specs.
With more than 5,000 unique signs and graphic elements per store, the time spent fixing mistakes added up.

Solution
Switching to Imagine solved two issues for the chain:
- Working with a single vendor eliminated the inconsistencies inherent in working with multiple vendors, and
- Imagine could handle the entire in-store visual elements supply chain, including floorplan analysis, CAD design, product manufacturing, and in-field installation management.
Utilizing the Imagine verification technology ensured vast improvements in development, production, and installation compliance.

Results
After partnering with Imagine for years, the chain has experienced a 67% decrease in lead times and a 300% increase in annual store opening and remodeling capacity.